— Production Log Data

97.4% uptime. Logged. Attributed. On record.

Cognitive robotics for a complex world

Wide environmental shot looking across a factory floor control station, a large monitor displaying a live operational dashboard with numeric readouts and status indicators in the foreground, industrial machinery visible in the background under bright overhead fluorescent lighting, framed from a low angle to emphasize the scale of the room
Wide environmental shot looking across a factory floor control station, a large monitor displaying a live operational dashboard with numeric readouts and status indicators in the foreground, industrial machinery visible in the background under bright overhead fluorescent lighting, framed from a low angle to emphasize the scale of the room
/ Aggregate across 14 sites

Three numbers that matter to your line

97.4%

1,840 cycles/shift

11 min avg unplanned stop

Median throughput across pick-and-place task classes. Measured per 8-hour production shift, not extrapolated from short-run samples.

System uptime averaged across all active deployments. Planned maintenance windows excluded and reported separately.

Mean unplanned downtime per incident. Both frequency and duration are logged for every site and available for any request.

+ Results by task class

Compare directly against your current line

Throughput and error rates are broken out by task class so you can map Rodril figures to the specific operations you run.

Pick and Place
Visual Inspection
Material Transfer

1,840 cycles/shift

2,210 parts/shift

94.8% schedule adherence

Across 4 transfer-task deployments. Variance per shift reported alongside median to show consistency, not best-case.

Error rate: 0.3% per 10,000 cycles. Logged across 6 sites, minimum 90-day run each.

False-positive rate: 1.1%. Measured under production lighting conditions, not controlled studio setups.

See how it performs in your environment

Run the system at your facility for free quick demo. You get the full production log — uptime, throughput, stops — before any commitment is made.